Case Study Archive - Pioneer Power Group /case-study/ Mon, 16 Oct 2023 14:02:30 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.1 Load Flow Study /case-study/load-flow-study/ Mon, 16 Oct 2023 13:59:24 +0000 /?post_type=case-study&p=921 Pioneer Power Group was contracted to perform a load-flow study for a large commercial facility. The end goals of the load flow study were twofold. One study goal was to prove that the loading within the system would not cause voltages in the system to sag or swell to the point where system performance was impacted, or equipment would be damaged. A second goal of the study was to ensure that distribution equipment, transformers, and cables were not subjected to continuous currents above their rated values.

The post Load Flow Study appeared first on Pioneer Power Group.

]]>
The post Load Flow Study appeared first on Pioneer Power Group.

]]>
Complex Study Completed /case-study/complex-study-completed/ Tue, 29 Aug 2023 19:36:03 +0000 /?post_type=case-study&p=916 Pioneer Power Group was tasked with performing short-circuit, coordination, and arc flash studies for a medium-sized commercial facility. During the data-gathering phase of the project, the customer realized that they were missing significant data sources required for study completion.

The post Complex Study Completed appeared first on Pioneer Power Group.

]]>
The post Complex Study Completed appeared first on Pioneer Power Group.

]]>
Preliminary Study Results /case-study/preliminary-study-results/ Wed, 21 Jun 2023 21:31:01 +0000 /?post_type=case-study&p=907 Pioneer Power Group was hired to conduct a study for a new switchboard. The project was focused on revising an existing study completed by a different firm while assisting the customer with a lead time issue for a new switchboard. The customer needed to complete the study quickly to meet lead time requirements from the equipment manufacturers.

The post Preliminary Study Results appeared first on Pioneer Power Group.

]]>
The post Preliminary Study Results appeared first on Pioneer Power Group.

]]>
Custom Label Requests /case-study/custom-label-requests/ Sun, 30 Apr 2023 00:51:41 +0000 /?post_type=case-study&p=898 Pioneer Power Group was contracted to perform an arc flash study and to provide arc flash labels showing relevant incident energies. The customer had specific, unusual requirements for the layout, text, and colors on their arc flash labels. Over the course of several projects for this customer, we modified the labels to match what was required for their specific purposes.

The post Custom Label Requests appeared first on Pioneer Power Group.

]]>
The post Custom Label Requests appeared first on Pioneer Power Group.

]]>
Same-Day Arc Flash Modelling /case-study/same-day-arc-flash-modelling/ Thu, 06 Apr 2023 15:40:33 +0000 /?post_type=case-study&p=891 Pioneer Power Group was contracted to perform arc flash modeling for a client that was struggling with time constraints and lack of data access. At the Pioneer Power Group, we focus on going above and beyond for our customers to prioritize safety, maximize efficiency, and provide speedy study results.

The post Same-Day Arc Flash Modelling appeared first on Pioneer Power Group.

]]>
The post Same-Day Arc Flash Modelling appeared first on Pioneer Power Group.

]]>
Successful Arc Flash Studies /case-study/successful-arc-flash-studies/ Fri, 06 Jan 2023 22:03:20 +0000 /?post_type=case-study&p=870 Arc flash studies can become very complicated when critical data points are unavailable. Pioneer Power Group was contracted to perform an arc flash study for a project that was missing vital information.

The post Successful Arc Flash Studies appeared first on Pioneer Power Group.

]]>
The post Successful Arc Flash Studies appeared first on Pioneer Power Group.

]]>
Reducing Arc Flash Danger /case-study/reducing-arc-flash-danger/ Fri, 11 Nov 2022 03:40:18 +0000 /?post_type=case-study&p=865 Pioneer Power Group was contracted to perform an arc flash study. At Pioneer Power Group, the safety of our customers and their clients is our absolute, number ONE priority.

The post Reducing Arc Flash Danger appeared first on Pioneer Power Group.

]]>
The post Reducing Arc Flash Danger appeared first on Pioneer Power Group.

]]>
Modeling Fault Current /case-study/modeling-fault-current-without-upstream-equipment-data/ Tue, 11 Oct 2022 17:37:23 +0000 /?post_type=case-study&p=861 Pioneer Power Group was contracted by a client to produce a series of studies for new electrical equipment which would be installed downstream of existing equipment. Three studies were to be completed:

The post Modeling Fault Current appeared first on Pioneer Power Group.

]]>
The post Modeling Fault Current appeared first on Pioneer Power Group.

]]>
No Submittals? No Problem! /case-study/no-submittals-no-problem-overcoming-obstacles-to-deliver-optimal-results/ Fri, 23 Sep 2022 12:46:08 +0000 /?post_type=case-study&p=857 Pioneer Power Group was contracted to perform a short-circuit/coordination study for the safe installation of a new Automatic Transfer Switch (ATS). Plans for the new equipment were already underway so our client needed the study results as quickly as possible.

The post No Submittals? No Problem! appeared first on Pioneer Power Group.

]]>
The post No Submittals? No Problem! appeared first on Pioneer Power Group.

]]>
Conflicting Scopes of Work /case-study/conflicting-scopes-of-work/ Thu, 31 Mar 2022 14:31:31 +0000 /?post_type=case-study&p=835 Pioneer Power Group was contracted to perform a coordination study for an industrial facility. The one-line diagrams of the distribution system contained both new and existing medium and low voltage equipment.

The post Conflicting Scopes of Work appeared first on Pioneer Power Group.

]]>
The post Conflicting Scopes of Work appeared first on Pioneer Power Group.

]]>
ATS Withstand & Closing Ratings /case-study/ats-withstand-closing-ratings/ Mon, 07 Mar 2022 17:09:32 +0000 /?post_type=case-study&p=830 Pioneer Power Group was contracted to perform a short-circuit study for an apartment complex. The system contained an automatic transfer switch (ATS) fed by the utility via an upstream panel on the normal power side, and by a generator on the emergency power side.

The post ATS Withstand & Closing Ratings appeared first on Pioneer Power Group.

]]>
The post ATS Withstand & Closing Ratings appeared first on Pioneer Power Group.

]]>
Short Circuit Studies /case-study/short-circuit-studies/ Tue, 11 Jan 2022 23:22:42 +0000 /?post_type=case-study&p=783 Pioneer Power Group was tasked to perform an electrical system study for a university; this included short circuit, coordination, and arc flash studies. The distribution system consisted of several switchboards, panelboards, and overcurrent protective devices that required evaluation to confirm that they would be able to withstand or interrupt any fault current in the system.

The post Short Circuit Studies appeared first on Pioneer Power Group.

]]>
The post Short Circuit Studies appeared first on Pioneer Power Group.

]]>