{"id":852,"date":"2022-05-17T18:49:04","date_gmt":"2022-05-17T22:49:04","guid":{"rendered":"https:\/\/www.pioneerpwr.com\/?p=852"},"modified":"2023-10-25T14:19:49","modified_gmt":"2023-10-25T18:19:49","slug":"the-value-of-power-system-studies-for-construction-projects","status":"publish","type":"post","link":"https:\/\/www.pioneerpwr.com\/articles\/the-value-of-power-system-studies-for-construction-projects\/","title":{"rendered":"The Value of Power System Studies for Construction Projects"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The rapidly evolving construction market presents several challenges to the design and installation of a properly function- ing electrical distribution system. Supply chain issues and changes to the manufacturer\u2019s equipment may result in unexpected delays. Electrical codes and their interpretations seem to be ever changing. Unexpected circumstances surrounding the current COVID-19 pandemic add additional constraints and concerns. Therefore, proper front-end engineering design and comprehensive power systems studies are critical to project success and must never be compromised.<\/p>

Reliable power systems studies are typically provided by qualified third- party engineering companies. These studies provide critical checks and balances to ensure systems operate reliably, efficiently, and safely.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\"Short-circuit\t\t\t\t\t\t\t\t\t\t\t
Photo 1. Short-circuit studies show how fault currents flow through the distribution system.<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Short-Circuit Studies<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The purpose of a short-circuit study is to calculate the amount of fault current that may exist at each critical equipment location within a distribution system (Photo 1)<\/b>. The end goal of a short-circuit study is to evaluate the ratings of each piece of distribution equipment to ensure the equipment is installed safely.\u00a0Calculations are typically performed as outlined in the IEEE Red Book (other- wise known as IEEE STD 141-1993).<\/span><\/p>

Due to the complexity of the calculations involved, computer software is commonly used (and even specified by engineers) to obtain accurate results. Models built within this soft- ware will include:<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t